   Problem:   

Customer just moved in to their new home only to discover the toilet was backed up and not draining properly.

   Inspection:   

Upon arrival, FWP removed the toilet and used our camera to inspect the sewer line. We found the camera could only travel 25' before hitting blockage forcing us to also inspect the line through the clean out found outside the home. We used a sonar/radar device to analyze the size of the blockage and mark the exact location. We found there was a total collapse of 6' to 8' of the home owners sewer line.

   Solution:   

We first tried to clear the blockage in order to get the sewer line to drain. However, the blockage was too hard packed and we were required to dig an access hole. We cut a small 3'x4' hole in a discrete location (a closet) in order to access the collapsed pipe. Because the pipe had been collapsed so long, we had to clear about 8' of dirt from the pipe. After cleaning the pipe, we used CIPP to reline the pipe beginning at the toilet through the collapsed section. This minimally invasive method for repair & reinstatement cleared the pipe and allowed the toilet to flow freely.

If FWP were called before the sewer line collapsed our customer could have saved 20-40% or more on the total project.

Benefits

Why the Fort Wayne Pipelining solution was the better solution.

▶︎ MINIMALLY INVASIVE/DESTRUCTIVE

​

Although we had to dig a hole it only had to be 1/3rd the size of the collapsed section. Because FWP does not need to access 100% of the clogged section, we were able to select a location to dig that access hole that was least damaging to the home

▶︎ FIND THE ROOT OF THE PROBLEM

​

Customer now knows the problem lurking and has scheduled to line the rest of the sewer line before they have a collapse that requires digging, trenching, replacement and restoring the home and property above ground.

▶︎ THE FW PIPELINING GUARANTEE

There will be no more collapsed sewer lines in this newly lined section. Fort Wayne Pipelining guarantees it with a 50 year plus expected life and a previously unheard of 10 year warranty.

▶︎ THE PERMANENT SOLUTION

We offer permanent solutions with the least possible invasiveness to your property!